I have 15 usercontrols all docked to the bottom.
So it displays as 15 narrow rectangles at the bottom of the form.
I now want the 5th one to be in the 6th position and the 6th one be in the 5th position.
That is, I want to interchange two of then on the form.
I don't want to delete the stack and rebuild it if there is a better way.
Is there a better way?
So it displays as 15 narrow rectangles at the bottom of the form.
I now want the 5th one to be in the 6th position and the 6th one be in the 5th position.
That is, I want to interchange two of then on the form.
I don't want to delete the stack and rebuild it if there is a better way.
Is there a better way?